EPCC Rio Grande Learning Resource Center Completed circa 1996
EPCC Rio Grande Learning Resource Center Completed circa 1996
The Learning Resource Center Addition at Rio Grande was completed. The cost of the remodeling and construction was approximately $1.5 million and was funded through revenue bonds.
Reportar esta entrada
Más sobre la misma comunidad-colección
Liz Sinclair and Victoria Sinclair
Victoria Sinclair in the contest for Miss El Paso - 2014. Liz ...
Victoria Sinclair, Miss El Paso 2014
Victoria Sinclair, Miss El Paso 2014 standing in front of stain ...
Victoria Sinclair, Miss El Paso 2014
Victoria Sinclair, Miss El Paso 2014 standing in front of stain ...
Victoria Sinclair, Miss El Paso 2014
Victoria Sinclair, Miss El Paso 2014 pointing to a display of ...