Kress Building

Kress Building

Kress department store first opened its doors in El Paso in 1907, at 211 N. Mesa. A 1916 fire destroyed part of the store, but it was rebuilt at the same location. A second fire in 1924 destroyed the store, and again it was rebuilt. In 1937, the store location was moved to the corner of Mills and Oregon Streets and the design of this new store became one of the most beautiful and unique stores in the entire chain. This new location originally housed part of the San Antonio and San Diego (Jackass) Mail stage line, which started business in July 1857, and a shop operated by Sam Hing, a private banker for the Chinese who also supplied labor for railroads and other contractors. Later, these businesses and others adjacent to it were replaced by the United States Federal Building. These were subsequently torn down to make room for the new Kress building. http://epcc.libguides.com/content.php?pid=346448&sid=2891832

Creador: victor ramirez

Área: Central / Downtown

Fuente: EPMH

Cargado por: El Paso Museum of History

Comentarios

Hacer un comentario
Gracias por su comentario

Reportar esta entrada

Elige la razón más importante para este reporte

Tu nombre

Tu correo electrónico

Detalle opcional

Gracias por su reporte

Más sobre la misma comunidad-colección

Bonnie Low - Gibson Group

As Associate Producer with the Visitor Experiences team Bonnie ...

Allan Smith - Gibson Group

Allan Smith - Director of Exhibitions - installing the Digital ...

Chalk the Block Festival de Arte Público 2014

Chalk the Block is a free 3 day Public Arts Festival that takes ...

Bonnie Low & David Crossan

Construction for the Digital Wall - January 13, 2015.

DIGIE

Special glass from Germany arrives. Contruction for the Digital ...

DIGIE

Special glass from Germany arrives. Contruction for the Digital ...

DIGIE

Special glass from Germany arrives. Contruction for the Digital ...

DIGIE

Special glass from Germany arrives. Contruction for the Digital ...

DIGIE

Bonnie Low stands in front of special glass from Germany. ...

Behind the Digital Wall

Stairs behind the Digital Wall. January 13, 2015.

Behind the Digital Wall

Stairs behind the Digital Wall. January 13, 2015.

DIGIE

Back of the screen that will hold the weight. January 13, 2015.

DIGIE

Allan Smith, Director of Exhibitions from the Gibson Group.

DIGIE

The Gibson Group --left to right: Allan Smith, Bonnie Low, and ...

DIGIE

Back of the 95 inch screen that will hold the weight. January ...

DIGIE

Photograph taken behind the Digital Wall - January 13, 2015.

DIGIE

Behind the Digital Wall --January 13, 2015.

DIGIE

The five 95 inch screens are installed - January 14, 2015.

DIGIE

The five 95 inch screens are installed - January 14, 2015.

DIGIE

Allan Smith - Director of Exhibitions for Gibson Group - making ...

DIGIE

David Crossan from the Gibson Group installing the five 95 inch ...

DIGIE

The five 95 inch screens are installed - January 14, 2015. David ...

DIGIE

The five 95 inch screens are installed - January 14, 2015.

home.search_collection