Pedestrian Pathway
Pedestrian Pathway
Pedestrian Pathway cost around $3,000.000.00 and was completed around the Spring of 2014. It takes you to Southwest University Baseball Park. The planning and designing of two pathways began with a $25,000 Our Town grant from the National Endowment for the Art and the money for construction was provided in the 2012 Quality of Life bonds.
Reportar esta entrada
Más sobre la misma comunidad-colección
Blue Flame Building, El Paso, TX circa 1975
The Blue flame Building was built by the El Paso Natural Gas ...
Oficina Postal en el centro de la ciudad de El Paso, Tejas
Looking out the front door of the Post Office. Located in ...