Pedestrian Pathway
Pedestrian Pathway
Pedestrian Pathway cost around $3,000.000.00 and was completed around the Spring of 2014. It takes you to Southwest University Baseball Park. The planning and designing of two pathways began with a $25,000 Our Town grant from the National Endowment for the Art and the money for construction was provided in the 2012 Quality of Life bonds.
Reportar esta entrada
Más sobre la misma comunidad-colección
Victoria Sinclair Miss El Paso 2014
Victoria Sinclair Miss El Paso 2014 with mother, Liz Sinclair ...
Victoria Sinclair Miss El Paso 2014
Victoria Sinclair Miss El Paso 2014 with Duv Kupver who did the ...
Victoria Sinclair Miss El Paso 2014
Victoria Sinclair Miss El Paso 2014 with mother, Liz Sinclair ...
Miss El Paso and Miss Teen El Paso
Victoria Sinclair, Miss El Paso 2014, Tulasi Gopalan, Miss Teen ...
Victoria Sinclair Miss El Paso finals 2014.=
Victoria Sinclair Miss El Paso finals 2014, first walk as Miss ...