Pedestrian Pathway
Pedestrian Pathway
Pedestrian Pathway cost around $3,000.000.00 and was completed around the Spring of 2014. It takes you to Southwest University Baseball Park. The planning and designing of two pathways began with a $25,000 Our Town grant from the National Endowment for the Art and the money for construction was provided in the 2012 Quality of Life bonds.
Reportar esta entrada
Más sobre la misma comunidad-colección
Ambulancia tirada por caballos
The McBean & Carr Ambulance in front of Providence Hospital. Mr. ...
Ronald D'Emory Coleman - El Paso, Tejas
Ronald D. Coleman, a United States Representative from El Paso ...
George Kinsinger - El Paso Times
Mr. Kinsinger was a member of the staff of the El Paso Times. He ...
Bill Latham, editor de El Paso Times y el Dr. Thomas Barnes
Bill Latham, the El Paso Times editor is to the left. Dr. Thomas ...
Gertrude Goodman y Sarah Lea - El Paso, Tejas
Gertrude Goodman (on the left) was commended by the Senate of ...