Pedestrian Pathway
Pedestrian Pathway
Pedestrian Pathway cost around $3,000.000.00 and was completed around the Spring of 2014. It takes you to Southwest University Baseball Park. The planning and designing of two pathways began with a $25,000 Our Town grant from the National Endowment for the Art and the money for construction was provided in the 2012 Quality of Life bonds.
Reportar esta entrada
Más sobre la misma comunidad-colección
Levantamiento de Pesas y Lucha en el centro El Paso - 2015
Weight Lifting and Wrestling Downtown El Paso- 2015
Levantamiento de Pesas y Lucha en el centro El Paso - 2015
Weight Lifting and Wrestling Downtown El Paso- 2015
Levantamiento de Pesas y Lucha en el centro El Paso - 2015
Weight Lifting and Wrestling Downtown El Paso- 2015
La placita San Jacinto en El Paso
The beautiful Christmas display in San Jacinto Plaza El Paso ...