"Great White Way" Postcard

"Great White Way" Postcard

The need for electricity in El Paso started around 1900, when El Paso grew from a small adobe village to a thriving city. The construction of the railroad marked the change in 1881; before, all the businesses had been on the other side of the river in Ciudad Juarez. Electricity on a large scale was first used in transportation: The mule-drawn streetcar system was ended in 1900 and instead, electric cars were being used. Since then, electric streetcars did not only operate between El Paso and Juarez but routes were built in all directions; to Fort Bliss, Government Hill and to the Mesa Street route. In 1886, the first small direct generating plant had been established, providing current for a few street lights and stores. By 1890, the El Paso pioneer Zach T. White, had assumed command of the electrical energy business and had new generating equipment installed at Third and Chihuahua Streets. The use of incandescent lamps began in El Paso stores and homes. Since then, electric systems grew and a larger generating plant was built (since 1910s). It supplied power not only to El Paso, but also to Juarez. El Paso Electric Railway Company was the largest electric company at that time. The colored postcard shows one street in downtown El Paso, probably in the 1910s, fully equipped with electric street lights and wires for the streetcars.

Área: Central / Downtown

Colección: Stansel Postcard Collection

Fuente: University of Texas at El Paso Library - Special Collections Department

ID de referencia: PH049-1-1-013

Cargado por: El Paso Museum of History

Comentarios

Hacer un comentario
Gracias por su comentario

Reportar esta entrada

Elige la razón más importante para este reporte

Tu nombre

Tu correo electrónico

Detalle opcional

Gracias por su reporte

Más sobre la misma comunidad-colección

DIGIE

Members of Gibson Group preparing to install the Digital Wall.

DIGIE

Digital Wall - January 12, 2015.

DIGIE

Digital Wall - January 12, 2015. Front entrance to the museum.

DIGIE

Members of Gibson Group preparing to install the Digital Wall.

DIGIE

Allan Smith from the Gibson Group preparing to install the ...

DIGIE

Digital Wall - January 12, 2015.

DIGIE

Digital Wall - January 12, 2015.

DIGIE

Digital Wall - January 12, 2015. One of a kind in the United ...

Hilton Strike, 1963

In 1963, workers of the Hilton Hotel (now Plaza Hotel) ...

Hilton Strike, 1963

In 1963, workers of the Hilton Hotel (now Plaza Hotel) ...

Hilton Strike, 1963

In 1963, workers of the Hilton Hotel (now Plaza Hotel) ...

Teresa Aguirre

Teresa Aguirre, 81, bends down to kiss the Singer 241-12 ...

El Paso

Downtown El Paso on an afternoon

Construcion de Southwest University Baseball Park

This is how the baseball park looked under construction on ...

DIGIE

Special glass from Germany arrives-----construction of the ...

DIGIE

Special glass from Germany arrives-----construction of the ...

DIGIE

Gibson Group Techical Director - David Crossan. January 13, ...

DIGIE

Gibson Group Techical Director - David Crossan. January 13, ...

DIGIE

Gibson Group Techical Director - David Crossan. January 13, ...

DIGIE - Bonnie Low

As Associate Producer with the Visitor Experiences team Bonnie ...

DIGIE

Construction on the Digital Wall - January 13, 2015

DIGIE

Screens for the Digital Wall--95 inch.

DIGIE

Installing the Digital Wall - January 13, 2015.

home.search_collection