American Dam - Rio Grande
American Dam - shot of the Rio Grande from bridge 1000ft. upstream from site. This photo was taken on October 2, 1936 at 2:00pm.
Área: Central / Smeltertown
Fuente: International Boundary and Water Commission
Cargado por: El Paso Museum of History
Showing 0 of 0 results
American Dam - Garage
American Dam - Garage. View from the southeast with a bridge visible in the background. This photo was taken on December 1, 1936 at 2:45 pm.
American Canal
A view of the American Canal looking northwards from Highway 170. A porch and boat house can be seen. This photo was taken on October 3, 1936 at noon.
American Canal - cleared right-of-way and debris
The American Canal. Photo shows cleared right-of-way and debris from old adobe buildings. This photo was taken on December 1, 1936 at 2:50 pm.
American Dam - Gate tender's house under construction
American Dam -Gate tender's house under construction. View southeast from Canal. Photo was taken on December 1, 1936 at 2:50pm.
Fuente: IBWC
American Dam - Gate tender's house
American Dam - Gate tender's house (Field Office); view from northeast. Photo was taken on December 16, 1936 at 2:40 pm.
American Dam
American Dam - View of location south; Wuerthman Property in middle distance.
American Dam - East Bank Levee
American Dam - East Bank Levee; view north from Levee. Photo taken on December 16, 1936 at 3:15pm.
American Canal - View north (opposite Jones School); showing Right-of-way clearing. Photo taken on December 16, 1936 at 3:30pm.
American Canal - View south (Wuerthman Rock House). Photo taken on December 16, 1936.
American Canal - View of location north (Wuerthman Rock House). Photo taken on December 16, 1936.
American Canal - View of location north (Globe Street). Photo taken on December 16, 1936 at 3:40pm.
American Canal - View of location north (Hart's Road). Photo taken on January 5, 1937.
American Canal - Demolition of Wuerthman's houses
American Canal - Demolition of Wuerthman's houses; view west from hill. Photo taken on January 5, 1937 at 3:45pm.
American Dam, 134
The competed section and the western cofferdam as seen form the southeast.
American Dam, 135
Underpinning completed between sections 78 and 80 of the American Dam.
American Dam, 136
The American Dam conduit section B forms and footing.
American Dam, 137
Placing the first concrete footings near station 81 of the American Canal.
American Dam, 138
Conduit section B forms and steel for footing are seen near station 81.
American Dam, 139
Conduit section B forms for footing as seen from the north of stations 79 & 75.
Elige la razón más importante para este reporte
Tu nombre
Tu correo electrónico
Detalle opcional
Gracias por su reporte
Looking from Madero's Camp to the American side.
Madero's headquarters near Asarco. Madero may be speaking to ...
Practicing with a fieldpiece during the Mexican Revolution. ...
This photograph may have been taken at the Rebel Camp near ...
The photograph shows the stacks of the ASARCO smelting site from ...
This church was originally named San Rosalia, and was built in ...
This is probably the Boundary Marker near Smeltertown, with the ...
The beginnings of ASARCO. Photograph taken from a souvenir ...
60-ton Converter Crane
60-ton hoist block
70-ton wooden bridge
300 ton press (shaft hub)
300 ton press, shaft hub 2
500 KW Crank
500 KW Generato
610' stack
828' stack
Photograph taken of a stack - upper platform -828' stack, ...
4160 Volt Switch
Air steam 400 turbine
Air lines manifold
Bag house ventilation
Bag house
Comentarios
Hacer un comentario