Mount Cristo Rey

Mount Cristo Rey

Mt Cristo Rey is a shrine to thousands of faithful in the El Paso and Southern New Mexico area. Dedicated in 1940, the cross of Christ on top of the mountain was the vision of Fr. Lourdes Costa, a local parish priest, who in 1933 after looking out the back window of his residence in the community of Smeltertown, envisioned erecting a monument at the summit of this glorious mountain. On August 31, 1937, Father Costa met with Bishop Schuler to suggest that his good friend, world famous sculptor Urbici Soler, be commissioned to construct the monument. While Costa devoted his time to financing the project, Soler was studying the site and making models of prospective ideas. A clay model made by Soler of his concept of the project was approved on December 7, 1937. Soler left for Austin on April 1, 1938 to select almost forty tons of the finest limestone from their famous quarries. He cut and shaped the large stones himself as he prepared them for shipping. He began the trip back to El Paso in September. Upon his return, work began in earnest. The base of the monument measures 14 feet wide and ten feet high. It was made to hold six inch by four inch memorial tile plaques made of Spanish Talavera with the names of contributors and sold for $25.00 each. The base was completed on May 15, 1939. The first stone of the limestone statue was placed on May 24, 1939 by Urbici Soler. From then on, until its completion, he was on the scaffold from 4:00 AM to sunset everyday. The statue was ready in time for pilgrimage on October 29, 1939.

Creator: Lotte Kryger Bro

Area: Central / Smeltertown

Collection: Neighborhood photos

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

Report this entry

Choose the most important reason for this report

Your name

Your email address

Optional detail

Thank you for your report

More from the same community-collection

American Dam, 117

Hand-grading the American Canal

American Dam

American Dam - View of site from bridge. Photo taken on January ...

American Dam, 118

Conduit section "B" from north of Station 81 and 50 of the ...

American Dam - P&H excavator driving pile

American Dam - View from middle of river, P&H excavator driving ...

American Dam, 119

Looking from the south, gate number three is open, gate number ...

American Dam, 120

Cleaning the upstream slab of the American Canal (view from the ...

American Dam - Driving piles in coffer-dam

American Dam - View northwest from sandbar on eastside of river, ...

American Dam, 121

The bonded riprap used to reinforce panels one through eight of ...

American Dam, 122

The downstream slab of the American Dam as seen from the east ...

American Dam - Beginning earth dyke

American Dam - View south from west end of foot-bridge. ...

American Dam, 123

Casting rock for the river levee (at stations 69 and 50) of the ...

American Dam 124

The P & H dragline excavator casting rock to the river levee at ...

American Dam - P&H clam-shell excavator

American Dam - View east from hill on west side; P&H clam-shell ...

American Dam 125

Pouring the eastern half of the highway culvert of the American ...

American Dam, 126

The beginning of the downstream dyke of the western cofferdam. A ...

American Dam - Closing gap in downstream dyke

American Dam - View north from middle of river. Closing gap in ...

American Dam, 128

The downstream dyke of the western cofferdam (as seen from the ...

American Dam, 129

A Barber-Greene conveyor closes the gap in the downstream dyke ...

American Dam, 130

The temporary earth dyke across the floor slab near pier two of ...

American Dam, 130 (a)

The temporary earth dyke across the floor slab near pier two of ...

American Dam, 130 (b)

Raising the grade of the southern dyke of the western cofferdam ...

American Dam, 131

The view from the northwest (from pier nine) of men building the ...

American Dam, 132

Over 4000 cubic square feet of water passing through the eastern ...