U.S.-Mexico Border fence
EE.UU.-México cerca de la frontera

U.S.-Mexico Border fence

Border Fence C-I, 6-26-09 Not the smartest thing I ever did. I kept thinking, “Oh, the things I’ll do for a picture!” I started out just wanting a couple of pictures of the Rio Grande from Paisano near Executive before the construction of the Border Fence blocked the view (not knowing construction would soon halt). After taking a few pictures of the Rio Grande and the Asarco smokestack (see the “Around El Paso” folder), I began walking toward town along Paisano. As I wanted pictures of the fence, I had to walk on the opposite side of the street, and that proved to be extremely difficult. As can be seen in pictures “C” and “G,” that side of the street has a knee-high concrete barrier, then a narrow space filled with brush, trash, and assorted thorny plants, then a chain-link fence. There was no choice but to push my way sideways through all those obstacles for quite a long way. At times, overgrown thorn trees totally blocked this narrow passage and I had to climb over the concrete barrier, walk past the tree, then climb back over before getting smeared across the barrier by oncoming traffic. The concrete barrier was so hot to the touch that leaning on it caused blisters. Often the weeds and thorns were waist high and I had to just force my way through them. My jeans, socks, and shoes were soon full of thistles. There were bleeding scratches on my arms, rips in my shirt from the thorns and fence (which swayed and buckled as I tried to keep my balance, and sometimes was caved in completely). Just beyond the fence was a muddy, noxious stream beside railroad tracks and the possibility of falling in was not soothing to contemplate. (See “train along Paisano 6-26-09” in the “Trains” folder.) I continued to plow through the brambles, weeds, trash and trees until finally I came upon a break in the center barrier of Paisano where the Asarco trucks pull in and out. I crossed finally and had an open sidewalk at last but still a long, hot walk to go. Picture “I” is from the W. Yandell overpass to Sunset Heights. I started this trek around 11:20 a.m. At 1:20 p.m. I dragged myself into the Circle K in Sunset Heights, bought a pint of water, and gulped it all before the #10 bus came. The day reached 98 degrees. And construction of the fence stopped right where it was in picture “D” and is still there as I write this in 2012.

Creator: Leo Miletich

Area: Central / Smeltertown

Collection: Snapshots of El Paso (1966-2012)

Source: Leo Miletich

Reference ID: Disc 2: Border Fence

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

Report this entry

Choose the most important reason for this report

Your name

Your email address

Optional detail

Thank you for your report

More from the same community-collection

American Dam - Coffer-dam and piers

American Dam - Coffer-dam and piers; view from west side of ...

American Canal - Work in progress

American Canal - Work in progress; view south. Photo taken on ...

American Dam

American Dam - View from southeast. Photo taken on March 20, ...

American Canal - Excavating inlet

American Canal - Excavating inlet. Photo taken on March 29, 1937 ...

American Dam - Setting first forms

American Dam - Setting first forms, Pier No. 9. Photo taken on ...

American Dam - Pier placement

American Dam - Forms for piers #8 & 9 in place. Pouring floor in ...

American Dam

American Dam - First pour into forms. Piers No. 7, 8, & 9. Mixer ...

American Dam - Insley Skimmer

American Dam - Insley Skimmer excavating for Rip Rap, Unit 2. ...

American Dam - Insley Skimmer

American Dam - Insley Skimmer excavating for Rip Rap, Unit 2. ...

American Dam - Setting Well-points - El Paso, Texas

American Dam - Setting Well-points, south end of Unit 1. Photo ...

American Dam - Placing Bonded Rip Rap

American Dam - Placing Bonded Rip Rap, Unit 3. Photo taken on ...

American Dam - Placing Bonded Rip Rap

American Dam - Placing Bonded Rip Rap, Units 2 and 3. Photo ...

American Dam - Placing Bonded Rip Rap

American Dam - Placing Bonded Rip Rap, Units 2 and 3. Photo ...

American Dam - Placing Bonded Rip Rap

American Dam - Placing Bonded Rip Rap, Unit 2. Photo taken on ...

American Dam - Pier Construction

American Dam - Piers No. 4, 5, and 6 ready to pour; survey party ...

American Dam

American Dam - View from west end of foot-bridge. Photo taken on ...

American Canal Inlet

American Canal Inlet - Moretrench well-points. Photo taken on ...

American Canal Inlet

American Canal Inlet - Moretrench Wellpoints in inlet area. ...

American Canal

April 19 1937, More Trench at well point, inlet area American ...

American Canal

April 19 1937, American Dam pouring pier at No. 4,5,6 mixer at ...

American Canal

April 19 1937, American Dam sewer manhole construction at No.1 ...

American Canal

April 21 1937, American Dam concrete entering floor slab W1/2 of ...

American Canal

April 21 1937, American Dam concrete entering floor slab W1/2 of ...

home.search_collection