El Paso Streetcar Track Construction
Construcción de la ruta del Tranvía de El Paso
El Paso Streetcar Track Construction
El Paso Streetcar: Construction crews worked diligently throughout 2017 to place tracks along the 4.8 mile route for the El Paso Streetcar Project. Crews were able to complete both the Downtown and Uptown loops ahead of schedule.
Report this entry
More from the same community-collection
Argyria Louise White, aged 5 months
There were a number of families named White living in El Paso at ...
Henry M. Walker - Secretary of the El Paso Central Labor Union
Henry M. Walker served in 1898 in Galveston, Tex. as president ...
Yard between electric plant and warehouse looking east.
Possibly the power plant on Santa Fe St. You can see a wooden ...
Electric Power Plant looking southwest.
A beautiful brick building with power lines strung everywhere. ...
First To Graduate From El Paso's Only High School-1887
Image caption: Kate Moore was one of two members of the first ...