Pedestrian Pathway
Pedestrian Pathway
Pedestrian Pathway cost around $3,000.000.00 and was completed around the Spring of 2014. It takes you to Southwest University Baseball Park. The planning and designing of two pathways began with a $25,000 Our Town grant from the National Endowment for the Art and the money for construction was provided in the 2012 Quality of Life bonds.
Report this entry
More from the same community-collection
El Paso Lodge # 130 A.F. & A.M. Temple (Trost & Trost)
Spring Ceremonial El Maida Temple, El Paso, Texas. 04/20/1928 in ...
El Paso Lodge # 130 gives thanks to EPPD
WM Gutierrez of El Paso No. 130 gave thanks to the El Paso ...
Joseph Smith (El Paso Lodge # 130 A.F. & A.M.)
|Joseph Smith | Served on the California Column. District Deputy ...