Pedestrian Pathway
Pedestrian Pathway
Pedestrian Pathway cost around $3,000.000.00 and was completed around the Spring of 2014. It takes you to Southwest University Baseball Park. The planning and designing of two pathways began with a $25,000 Our Town grant from the National Endowment for the Art and the money for construction was provided in the 2012 Quality of Life bonds.
Report this entry
More from the same community-collection
Map and Street Guide of El Paso, Texas circa 1925
Map and street guide of El Paso, Texas. The map includes ...
Biggs and Dan-d CVMA Nationals 2018, El Paso!
We rode 1500 miles to celebrate at the national event with our ...