Pedestrian Pathway
Pedestrian Pathway
Pedestrian Pathway cost around $3,000.000.00 and was completed around the Spring of 2014. It takes you to Southwest University Baseball Park. The planning and designing of two pathways began with a $25,000 Our Town grant from the National Endowment for the Art and the money for construction was provided in the 2012 Quality of Life bonds.
Report this entry
More from the same community-collection
El Paso Streetcar Brookville Load-In
El Paso Streetcar: Car #1506 being loaded onto freight truck at ...