Pedestrian Pathway
Pedestrian Pathway
Pedestrian Pathway cost around $3,000.000.00 and was completed around the Spring of 2014. It takes you to Southwest University Baseball Park. The planning and designing of two pathways began with a $25,000 Our Town grant from the National Endowment for the Art and the money for construction was provided in the 2012 Quality of Life bonds.
Report this entry
More from the same community-collection
International Bridge Design, 1910 - El Paso, Texas
An artist rendering of the International Bridge connecting El ...
El PAso, Bank & Trust Co. - El Paso, Texas
The interior of the El Paso Bank & Trust Co. Located on the SW ...
City National bank - El Paso, Texas
Photo of the City National Bank Building (on the left side of ...
Stevens Building - El Paso, Texas
The Stevens Building located at 026 1/2 Mesa Ave. The Building ...
St. Joseph's Sanatorium - El Paso, Texas
As with photo A5217: this building is identified as St. Joseph's ...