BRIO, El Paso Chihuahuas Mascot Enjoys BRIO Opening Day
Mascota disfruta día de la inauguración, por BRIO - 2014
BRIO, El Paso Chihuahuas Mascot Enjoys BRIO Opening Day
Photo: Mascot enjoys opening day for BRIO - 2014. Sun Metro’s new rapid transit system, BRIO, will start service on its Mesa Street corridor on Monday, Oct. 27. Buses will run every 10 minutes during peak service and 15 minutes during off-peak times Monday through Friday. The BRIO buses have three doors, free Wi-Fi, two TV monitors for passenger information, three interior bicycle racks, two wheel-chair positions and signal prioritization. Work on the entire Mesa corridor should be completed by February. The project costs $27.1 million, with $13.5 million coming from the Federal Transit Administration. http://www.elpasoinc.com/news/business_announcements/article_41f5043a-4a4b-11e4-914e-0017a43b2370.html
Report this entry
More from the same community-collection
Panoramic view over El Paso downtown
The picture is made from north of Downtown and shows El Paso ...
Carvings of Spaniards on Cortez Building
The picture shows parts of the decoration of the Cortez ...
Tiffany Dome in Camino Real Hotel
This 25-foot Tiffany glass dome graces the lobby of the Camino ...
Parade of US Army through Downtown
US Army troops parading through Pioneer Plaza with the Herald ...