Workers on Smelting Site

Workers on Smelting Site

The photograph captures three men during work at the ASARCO smelting site. In 1887, the Kansas City Consolidated Smelting and Refining Company (later the American Smelting and Refining Company, or ASARCO) copper and lead smelter was constructed a few miles west of downtown El Paso. The facility was a custom smelter that processed several different metals from ore that came from diverse sites. Although lead and zinc were extracted at the site, copper was the main product in the later years of operation. In 1945 the El Paso Herald-Post called attention to the poverty in Smeltertown, which was the village where the workers and their families, mostly Mexican, lived. In the early 1970s the site became the center of an environmental controversy. It was found out that many of the residents suffered from lead poisoning due to the huge amount of lead emission. In 1975 an injunction ordered ASARCO to modernize and make environmental improvements, which were not done due to the high costs. Against their wishes the residents were forced to move; their former homes were razed, leaving only the abandoned school and church buildings to mark the site of El Paso's first major industrial community.

Area: Central / Smeltertown

Collection: Historical records of the former ASARCO El Paso smelter site

Source: University of Texas at El Paso Library - Special Collections Department

Reference ID: MS585-0013

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

Report this entry

Choose the most important reason for this report

Your name

Your email address

Optional detail

Thank you for your report

More from the same community-collection

American Dam, 117

Hand-grading the American Canal

American Dam

American Dam - View of site from bridge. Photo taken on January ...

American Dam, 118

Conduit section "B" from north of Station 81 and 50 of the ...

American Dam - P&H excavator driving pile

American Dam - View from middle of river, P&H excavator driving ...

American Dam, 119

Looking from the south, gate number three is open, gate number ...

American Dam, 120

Cleaning the upstream slab of the American Canal (view from the ...

American Dam - Driving piles in coffer-dam

American Dam - View northwest from sandbar on eastside of river, ...

American Dam, 121

The bonded riprap used to reinforce panels one through eight of ...

American Dam, 122

The downstream slab of the American Dam as seen from the east ...

American Dam - Beginning earth dyke

American Dam - View south from west end of foot-bridge. ...

American Dam, 123

Casting rock for the river levee (at stations 69 and 50) of the ...

American Dam 124

The P & H dragline excavator casting rock to the river levee at ...

American Dam - P&H clam-shell excavator

American Dam - View east from hill on west side; P&H clam-shell ...

American Dam 125

Pouring the eastern half of the highway culvert of the American ...

American Dam, 126

The beginning of the downstream dyke of the western cofferdam. A ...

American Dam - Closing gap in downstream dyke

American Dam - View north from middle of river. Closing gap in ...

American Dam, 128

The downstream dyke of the western cofferdam (as seen from the ...

American Dam, 129

A Barber-Greene conveyor closes the gap in the downstream dyke ...

American Dam, 130

The temporary earth dyke across the floor slab near pier two of ...

American Dam, 130 (a)

The temporary earth dyke across the floor slab near pier two of ...

American Dam, 130 (b)

Raising the grade of the southern dyke of the western cofferdam ...

American Dam, 131

The view from the northwest (from pier nine) of men building the ...

American Dam, 132

Over 4000 cubic square feet of water passing through the eastern ...

home.search_collection