Construction Site Images - GO 10

Construction Site Images - GO 10

Construction Site Images - GO 10

Construction Site Images - GO 10

Construction Site Images - GO 10

Construction Site Images - GO 10

Construction Site Images - GO 10

Construction Site Images - GO 10

Construction Site Images - GO 10

Construction Site Images - GO 10

Construction Site Images - GO 10

Construction Site Images - GO 10

Construction Site Images - GO 10

GO 10 - 2016

GO 10 is a $158 million reconstruction project of I-10 between Executive Center and North Mesa. It is a TxDOT project that will completely transform the landscape of I-10 on El Paso Texas's Westside.

Area: Westside / Coronado

Source: Texas Department of Transportation (TxDOT)

Uploaded by: GO 10 TxDOT

Comments

Add a comment
Thank you for your comment

Tim, the GO 10 project engineer

Timothy F. Twomey, P.E., is the West Area Engineer for the TxDOT El Paso District. He oversees the GO 10 project. He is a 1986 graduate from the University of Texas at El Paso and has been a TxDOT employee for the past 28 years. Since 2003, he has worked behind the scenes making sure construction projects are performed on time, on budget and most importantly with your safety top of mind. For GO 10, Tim understands the impact construction activities will have on the traveling public, and that is why he has committed to writing a blog for the GO 10 website at www.go10elpaso.com. The blog allows him to communicate, in his own words, the status of the project. He asks that everyone please drive friendly, be patient, know the alternate routes, and consider using other commuting solutions. Keep in mind that the final product will be worth today's temporary inconveniences.

Area: Westside / Remcon

Source: Texas Department of Transportation (TxDOT)

Uploaded by: GO 10 TxDOT

Comments

Add a comment
Thank you for your comment

New Resler Flyover Ramp

The Resler Flyover Ramp will be demolished and replaced with a new flyover ramp. In this picture, you can see the replacement ramp taking shape alongside the existing ramp.

Area: Westside / Resler

Source: GO 10 TxDOT

Uploaded by: GO 10 TxDOT

Comments

Add a comment
Thank you for your comment

Work on Paisano (US 85) Bridge El Paso, TX, 2016

Ever wonder how bridges are built? This image captures part of the process. Crews pour concrete onto the Paisano (US 85) Bridge deck panels by using tubes that pump concrete up onto the bridge from trucks below.

Area: Westside / Resler

Source: GO 10 TxDOT

Uploaded by: GO 10 TxDOT

Comments

Add a comment
Thank you for your comment

Workers Alongside I-10

Workers complete improvements outside of traffic close to I-10 Westbound near Sunland Park.

Area: Westside / Resler

Source: GO 10 TxDOT

Uploaded by: GO 10 TxDOT

Comments

Add a comment
Thank you for your comment

New Collector-Distributor Lanes on I-10

Crews are placing concrete for the new CD lanes alongside three lanes of I-10 traffic.

Area: Westside / Resler

Source: GO 10 TxDOT

Uploaded by: GO 10 TxDOT

Comments

Add a comment
Thank you for your comment

Demolition of Buena Vista Bridge

Crews spent Sunday, Aug. 14, 2016 demolishing the Buena Vista Bridge, aka the Bridge to Nowhere. To protect the I-10 pavement, they covered the lanes with wood boards and a thick layer of sand.

Area: Westside / Resler

Source: GO 10 TxDOT

Uploaded by: GO 10 TxDOT

Comments

Add a comment
Thank you for your comment

New Resler Flyover Ramp

The existing Resler Flyover Ramp in El Paso Texas will be replaced with this new ramp. In April and May of 2017, crews began pouring the bridge deck.

Area: Westside / Resler

Source: GO 10 TxDOT

Uploaded by: GO 10 TxDOT

Comments

Add a comment
Thank you for your comment

New Direct Connectors to US 85 - El Paso, Texas

The direct connector ramps from I-10 Eastbound to US 85 near Sunland Park will improve traffic flow, increase traffic capacity and safety, and ultimately complete Loop 375. The ramps should be open to traffic by 2019.

Area: Westside / Resler

Source: GO 10 TxDOT

Uploaded by: GO 10 TxDOT

Comments

Add a comment
Thank you for your comment

The Dragnet

The Dragnet system is a cable net anchored into the ground at each end. It is used to prevent rogue vehicles from entering a work zone. GO 10 crews extend it across I-10 whenever they need to close I-10 lanes. The system can stop a semi-truck moving at 65 miles per hour.

Area: Westside / Resler

Source: GO 10 TxDOT

Uploaded by: GO 10 TxDOT

Comments

Add a comment
Thank you for your comment

Protecting our workers

Truck-mounted attenuators, like this one, are used to protect workers while they work on roadway pavement. It absorbs the impact of an oncoming vehicle and can save lives.

Area: Westside / Resler

Source: GO 10 TxDOT

Uploaded by: GO 10 TxDOT

Comments

Add a comment
Thank you for your comment

Wrecked crash attenuators

These wrecked attenuators were on display at the Work Zone Safety Week Event held by TxDOT on April 20, 2017.

Area: Westside / Resler

Source: GO 10 TxDOT

Uploaded by: GO 10 TxDOT

Comments

Add a comment
Thank you for your comment

Demolition of I-10 East Overpass at North Mesa Street

Crews demolished the I-10 East Overpass at North Mesa Street in March of 2017. Traffic was diverted temporarily to the center median while crews re-built the improved overpass. The demo operation took 27 hours to complete. The new overpass could take about six months to complete. Then, the westbound I-10 Overpass will be next for demo and re-building. Located in the El Paso, Texas area.

Area: Westside / Resler

Source: GO 10 TxDOT

Uploaded by: GO 10 TxDOT

Comments

Add a comment
Thank you for your comment

Report this entry

Choose the most important reason for this report

Your name

Your email address

Optional detail

Thank you for your report

More from the same community-collection

JLEP President Shirley Leavell

JLEP President Shirley Leavell served in 1949-50

JLEP President Maxine Luckett

JLEP President Maxine Luckett served in 1950-51

JLEP President Winifred Ponder

JLEP President Winifred Ponder served in 1951-52

JLEP President Myra Daugherty

JLEP President Myra Daugherty served in 1952-53

JLEP President Elizabeth Shaw

JLEP President Elizabeth Shaw served in 1953-54

JLEP President Orell DIck

JLEP President Orell Dick served in 1954-55

JLEP President Elizabeth Lund

JLEP President Elizabeth Lund served in 1955-56

JLEP President Betty Donaldson

JLEP President Betty Donaldson served in 1956-57

JLEP President Charlotte Massey

JLEP President Charlotte Massey served in 1957-58

JLEP President Hulda Rhodes

JLEP President Hulda Rhodes served in 1958-59

JLEP President Betty Bauman- El Paso Texas

JLEP President Betty Bauman served in 1960-61

JLEP President Joyce Palm

JLEP President Joyce Palm served in 1961-62.

JLEP President Tabby Marshall

JLEP President Tabby Marshall served in 1962-63

JLEP President Susan Mayfield

JLEP President Susan Mayfield served in 1963-64.

JLEP President Posey Smith

JLEP President Posey Smith served in 1964-65

JLEP President Betty Ruth Wakefield

JLEP President Betty Ruth Wakefield served in 1965-66

JLEP President Margaret Duncan

JLEP President Margaret Duncan served in 1966-67

JLEP President Mary Kay Kuper

JLEP President Mary Kay Kuper served in 1967-68

JLEP President Beverly Dick

JLEP President Beverly Dick served in 1968-69

JLEP President Margaret Jackson

JLEP President Margaret Jackson served in 1969-70.

JLEP Presidente Carolyn Ponsford

JLEP President Carolyn Ponsford served in 1970-71

JLEP President Nancy Smith

JLEP President Nancy Smith served in 1971-72

JLEP President Ginger Frost

JLEP President Ginger Frost served in 1972-73.

home.search_collection