American Canal - Work in progress

American Canal - Work in progress; view south. Photo taken on April 30, 1937 at 4:25pm.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Canal - Excavating inlet

American Canal - Excavating inlet. Photo taken on March 29, 1937 at 2:00pm.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Dam

American Dam - View from southeast. Photo taken on March 20, 1937 at 1:30pm.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Dam - Setting first forms

American Dam - Setting first forms, Pier No. 9. Photo taken on March 31, 1937 at 3:00pm.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Dam - Pier placement

American Dam - Forms for piers #8 & 9 in place. Pouring floor in unit 2. View from southeast. Photo taken on April 3, 1937 at 1:00pm.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Dam

American Dam - First pour into forms. Piers No. 7, 8, & 9. Mixer at No. 7; vibrator at No. 8. Photo taken on April 12, 1937 at 1:20pm.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Dam - Insley Skimmer

American Dam - Insley Skimmer excavating for Rip Rap, Unit 2. Photo taken on April 13, 1937 at 1:45pm.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Dam - Setting Well-points - El Paso, Texas

American Dam - Setting Well-points, south end of Unit 1. Photo taken on April 14, 1937 at 10:45am.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Dam - Insley Skimmer

American Dam - Insley Skimmer excavating for Rip Rap, Unit 2. Photo taken on April 13, 1937 at 1:45pm.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Dam - Placing Bonded Rip Rap

American Dam - Placing Bonded Rip Rap, Units 2 and 3. Photo taken on April 15, 1937 at 3:40pm.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Dam - Placing Bonded Rip Rap

American Dam - Placing Bonded Rip Rap, Unit 2. Photo taken on April 16, 1937 at 1:00pm.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Dam - Placing Bonded Rip Rap

American Dam - Placing Bonded Rip Rap, Unit 3. Photo taken on April 14, 1937 at 1:45pm.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Dam - Placing Bonded Rip Rap

American Dam - Placing Bonded Rip Rap, Units 2 and 3. Photo taken on April 15, 1937 at 1:30pm.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Dam - Pier Construction

American Dam - Piers No. 4, 5, and 6 ready to pour; survey party on top of Pier No. 4: Conveyor over Pier No. 6; view from southeast. Photo taken on April 17, 1937 at 11:30am.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Dam

American Dam - View from west end of foot-bridge. Photo taken on April 18, 1937 at 11:30am.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Canal Inlet

American Canal Inlet - Moretrench well-points. Photo taken on April 18, 1937 at 11:30pm.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Canal Inlet

American Canal Inlet - Moretrench Wellpoints in inlet area. Photo taken on April 19, 1937 at 1:00pm.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

Construction of American Dam 1937

Note: American Dam, Blasting E.end of downstream dyke, below completed units 2 and 3. For centuries the Rio Grande River has been used as a source of irrigation water for agriculture in the El Paso – Juarez area. In 1889 the governments of the United States and Mexico established the International Boundary Commission (IBC), in 1944 renamed the International Boundary and Water Commission (IBWC). One of its early actions was to discuss delivery of Rio Grande water to Mexico. In 1906, the two countries agreed to deliver 60,000 acre-feet of water annually to Mexico at the main irrigation Canal in Ciudad Juarez, known as Acequia Madre. The canal's mouth is two miles downstream from the international border. The remainder of the water would be used by American farmers in the ninety-mile-long El Paso valley. In times of drought both Mexican and American shares would be reduced on a percentage basis. The system did not provide a way for the United States to allot Mexico its rightful portion and keep the rest. As a result, Mexico took its share first and channeled the remainder into the Franklin Canal for the farms in the El Paso valley. According to some American estimates this permitted Mexico to siphon off up to three times its portion of irrigation water. Responding in 1935, Congress authorized two diversionary projects, the American Dam and the American Canal. The dam caught the water in New Mexico short of the international border, measured Mexico's share and allowed it to continue to the Acequia Madre, and diverted everything else into the American Canal, a two-mile feeder leading to the Franklin Canal. The American Canal parallels West Paisano Drive (US Highway 85) and the Burlington Northern Santa Fe Railroad track. The project has proved a successful solution to the problem of dividing the waters. Sources: http://www.tshaonline.org/handbook/online/articles/rua03 http://www.ibwc.gov/Files/EnvironmentalAssessment.pdf

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

Constuction of American Dam 1937

Note: 5-24-37, 9:40am, El Paso, Texas. American Dam; View from W. Levee (downstream); Courehesne's truck after sliding off downstream (cofferdam) dyke. For centuries the Rio Grande River has been used as a source of irrigation water for agriculture in the El Paso – Juarez area. In 1889 the governments of the United States and Mexico established the International Boundary Commission (IBC), in 1944 renamed the International Boundary and Water Commission (IBWC). One of its early actions was to discuss delivery of Rio Grande water to Mexico. In 1906, the two countries agreed to deliver 60,000 acre-feet of water annually to Mexico at the main irrigation Canal in Ciudad Juarez, known as Acequia Madre. The canal's mouth is two miles downstream from the international border. The remainder of the water would be used by American farmers in the ninety-mile-long El Paso valley. In times of drought both Mexican and American shares would be reduced on a percentage basis. The system did not provide a way for the United States to allot Mexico its rightful portion and keep the rest. As a result, Mexico took its share first and channeled the remainder into the Franklin Canal for the farms in the El Paso valley. According to some American estimates this permitted Mexico to siphon off up to three times its portion of irrigation water. Responding in 1935, Congress authorized two diversionary projects, the American Dam and the American Canal. The dam caught the water in New Mexico short of the international border, measured Mexico's share and allowed it to continue to the Acequia Madre, and diverted everything else into the American Canal, a two-mile feeder leading to the Franklin Canal. The American Canal parallels West Paisano Drive (US Highway 85) and the Burlington Northern Santa Fe Railroad track. The project has proved a successful solution to the problem of dividing the waters. Sources: http://www.tshaonline.org/handbook/online/articles/rua03 http://www.ibwc.gov/Files/EnvironmentalAssessment.pdf

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

American Dam

March 20, 1937 4:45 PM El Paso TX American Dam, view from southwest.

Area: Central / Smeltertown

Source: IBWC

Uploaded by: El Paso Museum of History

Comments

Add a comment
Thank you for your comment

Report this entry

Choose the most important reason for this report

Your name

Your email address

Optional detail

Thank you for your report

More from the same community-collection

American Dam, 116

Breaking the concrete pavement over the east half of the highway ...

American Dam, 117

Hand-grading the American Canal

American Dam

American Dam - View of site from bridge. Photo taken on January ...

American Dam, 118

Conduit section "B" from north of Station 81 and 50 of the ...

American Dam - P&H excavator driving pile

American Dam - View from middle of river, P&H excavator driving ...

American Dam, 119

Looking from the south, gate number three is open, gate number ...

American Dam, 120

Cleaning the upstream slab of the American Canal (view from the ...

American Dam - Driving piles in coffer-dam

American Dam - View northwest from sandbar on eastside of river, ...

American Dam, 121

The bonded riprap used to reinforce panels one through eight of ...

American Dam, 122

The downstream slab of the American Dam as seen from the east ...

American Dam - Beginning earth dyke

American Dam - View south from west end of foot-bridge. ...

American Dam, 123

Casting rock for the river levee (at stations 69 and 50) of the ...

American Dam 124

The P & H dragline excavator casting rock to the river levee at ...

American Dam - P&H clam-shell excavator

American Dam - View east from hill on west side; P&H clam-shell ...

American Dam 125

Pouring the eastern half of the highway culvert of the American ...

American Dam, 126

The beginning of the downstream dyke of the western cofferdam. A ...

American Dam - Closing gap in downstream dyke

American Dam - View north from middle of river. Closing gap in ...

American Dam, 128

The downstream dyke of the western cofferdam (as seen from the ...

American Dam, 129

A Barber-Greene conveyor closes the gap in the downstream dyke ...

American Dam, 130

The temporary earth dyke across the floor slab near pier two of ...

American Dam, 130 (a)

The temporary earth dyke across the floor slab near pier two of ...

American Dam, 130 (b)

Raising the grade of the southern dyke of the western cofferdam ...

American Dam, 131

The view from the northwest (from pier nine) of men building the ...